2013
Surface Remediation Completed
What to know:
The surface remediation occurred from 2011 to 2013. This work aimed to reduce human exposure to harmful toxins in the tailings and other waste materials, and reduce exposure of tailings and waste to groundwater and surface water runoff. To achieve this, waste rock and material were consolidated into two cells within superfund project area. These areas have established surface water diversions to minimize runoff contact, are buried with soil, and are overseeded with native vegetation. This work was overall successful- threats have been greatly reduced and the landscape is well established with grasses. The area was only minorly impacted by the 2013 September floods.
-
1861
Mining Begins in the Ward District
Mining activity began in 1861 following the discovery of gold... -
Late 1800s
Water Quality Issues Reported
Water quality issues were likely occurring since mining began in... -
1896
Captain Jack Mill Construction
Approximately 12 mines were operated in the headwaters area of... -
1992
Captain Jack Mine Closure
After nearly a century of activity under multiple owners at... -
2003
EPA Superfund Designation of Captain Jack
By 2003, Captain Jack Mill was listed on the EPA’s... -
2008
Record of Decision Issued
In 2008, Captain Jack Mill Superfund site completed a final... -
2013
Surface Remediation Completed
The surface remediation occurred from 2011 to 2013. This work... -
2015
Sub-Surface Remediation Began
The Subsurface Remediation began in late 2015. This work aims... -
2018
Emergency Release and Fish Kill Occurred
In October 2018, Left Hand Creek landowners reported a fish... -
2020
Sub-Surface Remediation Continued
After the emergency release and resulting fish kill, the sub-surface... - Future